PENYAMBUNGAN KONSUMEN TEGANGAN TINGI PT. CEMINDO GEMILANG, PAKET 1 : PENGADAAN & PEMASANGAN SUTT 150 kV GI PELABUHAN RATU - GI BAYAH
Client | : | PT. PLN (Persero) UIP Transmisi Interkoneksi Sumatera Jawa |
Location | : | Pelabuhan Ratu |
Period | : | 2013 |
Outline of Project
Overhead HVDC Transmission Line System 150 KV
PEKERJAAN PENGADAAN PEMASANGAN JARINGAN INTERKONEKSI 150 kV BATAM - BINTAN PAKET 2 : TRANSMISI DAN GARDU INDUK 150 kV
Client | : | PT. PLN UIP JARINGAN SUMATERA I |
Location | : | Batam - Bintan |
Period | : | 2013 |
Outline of Project
Overhead HVDC Transmission Line System & Transformer 150 KV
COMBINED CYCLE POWER PLANT (CAPACITY 120 MW)/ OWNER SCOPE PROYEK COMBINED CYCLE POWER PLANT (CAPACITY 120 MW)
Client | : | PT KRAKATAU DAYA LISTRIK |
Period | : | 2012 |
Outline of Project
Build a New 120MW Combined Cycle Power Plant
Scope of Work
Procurement and Construction
HIGH VOLTAGE TRANSMISSION LINE
Client | : | PT Perusahaan Listrik Negara (Persero) |
Location | : | Rangkas, Banten - Indonesia |
Period | : | 2010 |
Outline of Project
Upgrading SUTT 70 KV
Scope of Work
Procurement & Construction
CONSTRUCTION OF GI 150KV TUBAN & UPGRADING GI 150KV, PLTU 3 JATIM
Client | : | PT PLN |
Location | : | Gresik, Jatim - Indonesia |
Period | : | 2009 |
Outline of Project
Construction of GI 150KV T uban & Upgrading GI 150 KV , PL TU 3 Jatim
Scope of Work
Procurement and Construction
EPC PLTG 2X40 MW
Client | : | PT. Meppogen |
Location | : | Palembang Sumsel - Indonesia |
Period | : | 2007 |
Outline of Project
Build a New PL TG 2x40 MW
OVERHEAD T/L 150 KV NEW CILEGON - ASAHIMAS
Client | : | PT Perusahaan Listrik Negara (Persero) |
Location | : | Cilegon, Banten - Indonesia |
Period | : | 1998 |
Outline of Project
Installation of new overhead T/L 150 KV from new Cilegon Substation to Asahimas Substation.
Scope of Work
EPC Contract for the project includes engineering, foundation works, supply and installation of tubular steel poles. 83 unit tubular steel poles in varies type are supplied and installed
EXPANSION UPGRADING OF POWER DISTRIBUTION SYSTEM
Client | : | PT Krakatau Steel |
Location | : | Cilegon, Banten - Indonesia |
Period | : | 1989 |
Outline of Project
Istallation of interconnecting system between PT Krakatau Steel's steam turbine power plant (PLTU) and PT PLN (Persero)'s Substation.
Scope of Work
Engineering and project Management
LHOKNGA POWER PLANT PROJECT, CIVIL PACKAGE
Client | : | Xiame Huadian Power Equipment Co.Ltd |
Location | : | Lhoknga, NAD - Indonesia |
Outline of Project
Power Plant that Support PT SAI Operational.
Scope of Work
Egineering, Procurement and Construction (Civil Package)