Project Experience
CRUDE PALM OIL PLANT
| Client | : | PTPN III |
| Location | : | Hapesong, South T apanuli - North Sumatra |
| Period | : | 2011 |
Outline of Project
CPO Plant 30 ton/hour
Scope of Work
Engineering, Procurement and Construction
CEMENT PLANT PROJECT
| Client | : | PT Semen Andalas Indonesia |
| Location | : | Lhoknga, NAD - Indonesia |
| Period | : | 2008 |
Outline of Project
Development of Reconstruction of cement palnt (Civil Package Facilities)
Scope of Work
EPC basic, Project management, demolition work; temporary work; T emporary service i.e storage, utility , access, Defects and defeciency remedying, commissioning, Warranties
Restoration Of Furnace 1
| Client | : | PT. Pertamina |
| Location | : | Sorong Irian Jaya - Indonesia |
| Period | : | 2007 |
Outline of Project
Restoration of Furnace 1 And Supporting Facilities on Refinery
Scope of Work
P,C
CRUDE PALM OIL PLANT
| Client | : | PT Nirmala Abdi Damai |
| Location | : | Indragiri Hilir Riau - Indonesia |
| Period | : | 2003 |
Outline of Project
Development of a integrated Crude Palm Oil Mill Plant with production capacity of 30 ton FFB/hour expandable to 60 ton FFB/hours, including the infrastructure and other facilities required to support the mill.
Scope of Work
Engineering, Procurement and Construction (Consortium PT Krakatau Engineering and C.B. Industrial Product Sdn. Bhd.)
REPAIR WORKS FOR GRAVING DOCK AND SUPPORTING EQUIPMENT
| Client | : | PT PAL (Persero) |
| Location | : | Surabaya, East Java - Indonesia |
| Period | : | 2002 |
Outline of Project
The aim of this project is to repair the existing graving dock and its facilities which was damaged due to fire. The rapairing work includes improvement of dock wall, moveable roof, fire water pipe, fire hydrant, portable compressor, fire extinguisher, trasformer and LCC Crane with Capacity of 40 Ton.
Scope of Work
Engineering, Procurement and Construction
REVAMPING OF TANDEM COLD MILL TO BE CONTINUOUS TANDEM COLD MILL
| Client | : | PT Krakatau Steel |
| Location | : | Cilegon, Banten - Indonesia |
| Period | : | 2000 |
Outline of Project
Revamping of existing Tandem Cold Mill (TCM) to be Continuous Tandem Cold Mill (CTCM). This Project is part of Modernization of Cold Rolling Mill.
Scope of Work
Leader of consortium between PT Krakatau Engineering and VAI - Clecim (VAIC) and responsible for EPC works for of all local portion.
1200 MTSD AMMONIA / 1725 MTSD UREA PLANT
| Client | : | PT Pupuk Iskandar Muda |
| Location | : | Lhokseumawe, Aceh, NAD - Indonesia |
| Period | : | 1999 |
Outline of Project
Development of new Ammonia and Urea Plant with production capacity of 1200 MTSD Ammonia and 1725 MTSD Urea, including the infrastructure and other facilities required to support the plant.
Scope of Work
EPC contract was awarded to consortium between Toyo Engineering corporation as Foreign contractor and PT Rekayasa Industry & PT Krakatau Engineering as Indonesia Main Contractor. KE was responsible for the utility, offsite facilities and auxiliary, including water treatment plant, demineralized plant, waste water treatment unit and other facilities.
KERNEL OIL PLANT (PKO) PLANT CONSTRUCTION
| Client | : | PT Perkebunan Nusantara III |
| Location | : | Medan, Sumut - Indonesia |
Outline of Project
400 TPD Kernel Oil Plant
Scope of Work
Engineering, Procurement, Construction
PULP AND PAPER MILL
| Client | : | PT Wira Karya Sakti (Indah kiat Group) |
| Location | : | Kuala Tungka,Jambi - Indonesia |
Outline of Project
Development of integrated Pulp and Paper Mill with production capacity of 1500 tons per day, including the infrastructure and other facilities required to support the mill.
Scope of Work
Main contractor for the installation works, including installation of mill equipment, power plant, pipieline and other facilities. Approximately 36.000 tons of materials and equipment are installed and more than 1.000 personnel mobilized during the installation works. 09. LADLE FURNACE FOR
TUBAN CEMENT PLANT I, II, III
| Client | : | PT Semen Gresik (Persero) |
| Location | : | Tuban, East Java - Indonesia |
Outline of Project
Development of three units new cement Plant with production capacity of 2.3 milion tons per year for each plant, including the infrastructure and other facilities required to support the plants.
Scope of Work
Project management, supervision of fabrication and construction.
