ZERO REFORMER DIRECT REDUCTION OF IRON ORE PLANT
Client | : | PT Krakatau Steel |
Location | : | Cilegon, Banten - Indonesia |
Period | : | 2011 |
Outline of Project | : | - Revitalization of HYL III Zero reformer - T o increase Capacity From 5.000 TPD to 5.800 TPD - Reduce Maintenance Cost (with out Reformer) - Operatable with Low Pressure of Natural Gas |
Scope of Work | : | Engineering, Procurement, Construction |