Green scenery

DRI HYL - III PLANT

Client : PT Krakatau Steel
Location : Cilegon, Banten - Indonesia
Period : 1990
Outline of Project :

Development of new DRI HYL III Direct Reduction Plant with production capacity of 1.350.000 tons per year direct reduction iron, including the infrastructure

Scope of Work :

EPC contract was awarded to consortium between MAN GHH, Ferrostaal AG, Hysla S.A De C.V and PT Krakatau Engineering. KE was responsible for the all local portion of the contract, including detail engineering, civil works, fabrication and erection of steel structures and installation of equipment.