DRI HYL - III PLANT
Client | : | PT Krakatau Steel |
Location | : | Cilegon, Banten - Indonesia |
Period | : | 1990 |
Outline of Project | : | Development of new DRI HYL III Direct Reduction Plant with production capacity of 1.350.000 tons per year direct reduction iron, including the infrastructure |
Scope of Work | : | EPC contract was awarded to consortium between MAN GHH, Ferrostaal AG, Hysla S.A De C.V and PT Krakatau Engineering. KE was responsible for the all local portion of the contract, including detail engineering, civil works, fabrication and erection of steel structures and installation of equipment. |