ZERO REFORMER DIRECT REDUCTION OF IRON ORE PLANT
| Client | : | PT Krakatau Steel | 
| Location | : | Cilegon, Banten - Indonesia | 
| Period | : | 2011 | 
| Outline of Project | : | - Revitalization of HYL III Zero reformer - T o increase Capacity From 5.000 TPD to 5.800 TPD - Reduce Maintenance Cost (with out Reformer) - Operatable with Low Pressure of Natural Gas | 
| Scope of Work | : | Engineering, Procurement, Construction | 

